2024 Nov 5 :: City/Town of Deep River :: Question 2 :: Local QuestionShall the Town of Deep River, appropriate $8,950,000.00 to build a new Firehouse to replace the existing structure, to include, but not be limited to, architectural design and plans, construction plans, bidding documents, document review, site preparation, permitting, demolition, utility connections, engineering review and construction reserves" and “authorize financing the appropriation through a loan not to exceed $8,950,000.00 or issuing bonds, notes or temporary notes in an amount not to exceed $8,950,000.00?
SHARE THIS DATA:
Choices
Yes
No
Actions
2024 Nov 5 :: City/Town of Deep River :: Question 2 :: Local QuestionShall the Town of Deep River, appropriate $8,950,000.00 to build a new Firehouse to replace the existing structure, to include, but not be limited to, architectural design and plans, construction plans, bidding documents, document review, site preparation, permitting, demolition, utility connections, engineering review and construction reserves" and “authorize financing the appropriation through a loan not to exceed $8,950,000.00 or issuing bonds, notes or temporary notes in an amount not to exceed $8,950,000.00?
Ballot Question Results
City/Town of Deep River |
|
|
Total Votes Cast |
---|---|---|---|
Totals |
1,609 |
1,156 |
2,765 |